|
"Quality in every Weld" For a free estimate call: (604) 522-7790
1010 Derwent Way
Home Services Projects Founder Quality Assurance Certifications Contact us |
|
|
–SS Stainless Projects– –Georgia Mechanical 24" & 36" 1/2" wall for Olympic Village (2010) finish Date 2009 –Unified Alloys 6" Sch80 304L & Sch 40 304L (Finished Jan 2009) – Unified Alloys small bore Sch 10 304L – Whitewater West Industries Ltd. (Master Blaster Nozzles)
– Whitewater West Industries Ltd. (Tube Supports For Dubai Atlantis The Palm) (round water slide support & square tube slide supports
– Fred Welsh (3" Sch 10 pipe spool). – Brymark Installations (8" Stainless Steel pump stations).
– Pipe spooling (Stainless Steel) pre fabrication for Hinton Pulp. –St. Pauls Hospital (Kidney Dialysis Piping)
–1" Stainless Steel 0.065 wall Tubing –July 2007 –Piping For Hydrogenics Test Systems July 2007 –Header Tubing for Sapon Installations July 2007 –Piping Header assembly Maple Reinders (West bank Irrigation).
–Finish Date March 2007. –Branches pulled out by T-Drill –U.S. Navy project manufactured by Oceanworks International Corp. welded by S.S. Stainless Inc.
|
|
Copyright © 2006
SS STAINLESS Inc.
|